New   AI-assisted compliance for Indian businesses. Plan your India entry → ☎ +91-8595441494 contact@kamrit.com Login →

Business Plans › Building & Construction

Cement Manufacturing (Medium Scale) Project Report: Industry Trends, Plant Setup, Machinery, Raw Materials, Investment Opportunities, Cost and Revenue

Report Format: PDF + Excel  |  Report ID: KMR-B3-2049  |  Pages: 189

Last reviewed: by KAMRIT research team

Article below is indicative only

This free report description below is to give you an investor-grade overview of the opportunity, CapEx range, regulatory architecture, and project economics. Specific BIS / IS standard numbers, FSSAI thresholds, licence fees, GST HSN codes, and government scheme rates change frequently and should be verified against the issuing authority before commitment. Engage KAMRIT for a verified, project-specific compliance map signed off by a named partner.

Market size, FY2026

₹26,562 crore

CAGR 2026-2033

8.3%

CapEx range

₹198.0 crore - ₹2868 crore

Payback

3.0 - 5.0 yrs

Cement Manufacturing (Medium Scale): DPR Summary

The Indian cement industry stands at an inflection point driven by sustained infrastructure capital expenditure and a residential construction recovery. The market is valued at ₹26,562 crore in FY2026 and is projected to reach ₹46,499 crore by 2033, reflecting a CAGR of 8.3 percent over the 2026-2033 period. This growth trajectory is underpinned by the Housing for All mandate, PMAY-U fund disbursements exceeding ₹2 lakh crore annually, and the PM Gati Shakti National Master Plan which has unlocked 148 critical infrastructure projects across highways, railways, and logistics parks.

For a medium-scale cement manufacturing project with a capital outlay ranging from ₹198 crore to ₹2,868 crore, the competitive landscape is dominated by three scaled operators. UltraTech Cement, the Aditya Birla Group flagship with an installed capacity exceeding 140 million tonnes per annum, sets the benchmark for distribution density and procurement scale. Ambuja Cements, now under the Adani Group umbrella with a capacity of 67 million tonnes, has accelerated its eastern corridor expansion.

Shree Cement, the Beawar-headquartered player with 52 million tonnes capacity, maintains a lean cost structure that underpins its competitive positioning in North and East India markets. The medium-scale entrant faces a structurally supportive demand environment but must navigate commodity-linked input costs, regulatory compliance intensity, and the capital intensity of modern kiln technology to achieve the targeted payback period of 3.0 to 5.0 years.

India's cement manufacturing (medium scale) market is at ₹26,562 crore (FY26) and growing 8.3% to ₹46,499 crore by 2033. KAMRIT's DPR walks a promoter through a mega-project with CapEx of ₹198.0 crore - ₹2868 crore and a 3.0 - 5.0-year payback. Housing for All scheme momentum is the leading demand catalyst.

The report is positioned for a mega-project entrant and is structured for direct submission to a commercial bank or NBFC for term-loan sanction under the Means of Finance set out below.

Market trajectory

₹26,562 crore in 2026, projected ₹46,499 crore by 2033 at 8.3% CAGR.

0 cr 12,184 cr 24,368 cr 36,552 cr 48,736 cr 2026: ₹26,562 cr 2027: ₹28,767 cr 2028: ₹31,154 cr 2029: ₹33,740 cr 2030: ₹36,541 cr 2031: ₹39,573 cr 2032: ₹42,858 cr 2033: ₹46,415 cr ₹46,415 cr 202620302033

Projection at constant CAGR; actual trajectory varies with macro and category shifts.

Regulatory and licence map for this cement manufacturing (medium scale) project

Note: The regulatory items below outline the typical compliance architecture for this project type. Specific BIS / IS standard numbers, licence thresholds, GST HSN codes, and scheme rates referenced should be verified with the issuing authority (see References & primary sources at the bottom of this page). KAMRIT's compliance team confirms each item against current notifications during project engagement.

Cement manufacturing in India operates under a layered approvals architecture spanning environment, safety, land use, and operational licensing. The sector is governed by the Environment Protection Act, 1986 and the Air and Water Acts, with specific Consent for Establishment from State Pollution Control Boards being the foundational gate.

  • Consent for Establishment and Consent for Operation under the Water Act, 1974 and Air Act, 1981: Form C applications to the State Pollution Control Board, mandatory for plants with kiln capacity above 1,500 TPD; (EIA) Notification, 2006 mandates public hearing for greenfield projects exceeding 1 million tonnes annual capacity.
  • Environmental Clearance from the Ministry of Environment, Forest and Climate Change (MoEFCC): Scoping tier requires preparation of Terms of Reference; EIA study covering fugitive emissions, particulate matter, and biodiversity impact within a 10 km radius.
  • Factory Licence under the Factories Act, 1948: Registration with the Directorate of Industrial Safety and Health; requirement for a qualified Safety Officer and annual health check documentation for workers in grinding and kiln sections.
  • Pollution Control Board CTO with specific particulate matter limits of 100 mg/Nm3 for kiln stacks and 150 mg/Nm3 for raw mill stacks under the Cement Manufacturing Standards.
  • BIS Certification under IS 269:2015 (OPC), IS 1489 (PPC), and IS 455 (PSC): Mandatory for each dispatch batch; third-party testing from BIS-approved laboratories at quarterly intervals.
  • Explosives Licence for ammonium nitrate storage under the Explosives Act, 1884: Required for on-site storage exceeding 500 kg; District Magistrate-level approval with annual renewal.
  • Ground Water Abstraction Permit from the Central Ground Water Authority for plants drawing more than 100 cum per day, applicable in water-stressed zones across Rajasthan, Gujarat, and Maharashtra.
  • CLU (Change of Land Use) and Mining Lease approvals for captive limestone extraction: District Mining Officer lease under the Mines and Minerals (Development and Regulation) Act, 1957; environment clearance for mining leases above 5 hectares.

KAMRIT Financial Services LLP manages the end-to-end approvals filing strategy, coordinating EIA preparation, BIS testing schedule, and SPCB liaison for Consent Management. Our team has executed 23 cement sector DPRs across Rajasthan, Madhya Pradesh, and Chhattisgarh, with an average approvals timeline of 14 to 18 months for greenfield integrated plants.

Compliance setup process

Typical sequence to take this project from incorporation to ready-to-operate. Phases overlap in practice; durations are working-day estimates with normal MCA / state portal turnaround.

Indicative timeline: ~3 to 6 months total PHASE 1 Entity formation 2-3 weeks hover for detail PHASE 2 BIS / Sector L... 4-12 weeks hover for detail PHASE 3 Factory & safety 4-8 weeks hover for detail PHASE 4 Environmental 6-16 weeks hover for detail PHASE 5 Tax & schemes 2-4 weeks hover for detail Phase 1 must complete before Phases 2-5. Phases 2-5 can largely run in parallel once entity is incorporated.
Sectoral context for this cement manufacturing (medium scale) project

The cement sector is segmented acrossOrdinary Portland Cement (OPC), Portland Pozzolana Cement (PPC), Portland Slag Cement (PSC), and specialty variants including white cement and oil-well cement. OPC 53-grade commands the premium sub-segment in housing and industrial construction, growing at approximately 9.1 percent annually, while PPC dominates the bulk of blended cement demand with a 55 percent market share, driven by its cost advantage and lower heat of hydration suitable for mass concrete applications. PSC, leveraging steel plant slag availability, is expanding at 7.8 percent CAGR in coastal and industrial zones.

The fly ash utilization pathway is becoming structurally embedded as thermal power plant ash availability tightens, pushing cement majors to secure long-term fly ash supply agreements. The grey cement segment accounts for 92 percent of the 410 million tonne annual market, while premium and specialty cements represent the fastest-growing sub-segment at 11.2 percent CAGR, driven by urbanization and quality consciousness in tier-2 and tier-3 cities. The organised sector commands 78 percent of capacity against 22 percent for standalone grinding units and mini-cement plants, a consolidation trend reinforced by the BS VI emission standards for kiln operations and the GST rationalisation that eliminated cascading taxes for integrated players.

Project-specific demand drivers

  • Housing for All scheme momentum
  • PMAY-U funding
  • PM Gati Shakti infrastructure pipeline
  • Real estate residential demand recovery
Demand drivers

Ordered by KAMRIT's view of relative importance for this category in India.

Top drivers (longer bar = stronger signal) Housing for All scheme momentum (relative weight ~100%) 1. Housing for All scheme momentum Relative weight ~100% PMAY-U funding (relative weight ~80%) 2. PMAY-U funding Relative weight ~80% PM Gati Shakti infrastructure pipeline (relative weight ~60%) 3. PM Gati Shakti infrastructure pipeline Relative weight ~60% Real estate residential demand recovery (relative weight ~40%) 4. Real estate residential demand recovery Relative weight ~40% Weights are KAMRIT's heuristic ordering, not empirical regression.
Technology and machinery benchmarks

Modern cement manufacturing for a medium-scale project targets a 3,000 to 5,000 TPD (tonnes per day) production line, which aligns with the ₹198 crore to ₹2,868 crore CapEx envelope depending on whether the scope includes captive limestone mining and wharf infrastructure. The preferred kiln technology is a preheater-precalciner kiln with a four-stage or five-stage cyclone preheater, delivering thermal energy consumption of 750 to 780 kcal per kg of clinker against the older wet-process kilns consuming 1,100 to 1,300 kcal per kg. FLSmidth of Denmark and thyssenkrupp Industrial Solutions (Germany) supply the pyroprocessing line with turnkey erection, while KHD Humboldt Wedag (Germany) and Sinoma (China) compete on cost competitiveness for the grinding and crushing stations.

The vertical roller mill (VRM) for raw meal grinding has displaced ball mills for new installations, reducing power consumption from 18 to 20 kWh per tonne to 12 to 14 kWh per tonne for raw meal. For cement grinding, the roller press and ball mill circuit configuration is preferred for OPC 53-grade, delivering 32 to 36 kWh per tonne against 38 to 42 kWh for ball mill only circuits. The captive power plant configuration typically comprises a 10 to 15 MW WHRB (Waste Heat Recovery Boiler) supplementing grid power, reducing grid dependency to 35 to 40 percent of total load.

Cooler specific power consumption benchmarks at 8 to 10 kWh per tonne of clinker for modern cross-bar coolers. Equipment suppliers with Indian assembly operations include Larsen and Toubro (L&T) for material handling and crushing equipment, and TRF Limited for screens and apron feeders.

Bankable Means of Finance for this cement manufacturing (medium scale) project

The recommended means of finance for a ₹650 crore integrated cement plant targeting 4,000 TPD positions the debt-equity ratio at 2.5:1, yielding a debt quantum of approximately ₹464 crore against ₹186 crore equity. State Bank of India, as the lead lender for infrastructure and manufacturing projects, offers Term Loans at base rate plus 45 to 75 basis points, with a tenure of 10 to 12 years including a 2-year construction moratorium. HDFC Bank and Axis Bank compete for the working capital limits, extending Cash Credit of ₹45 to ₹60 crore covering 90 days of raw material inventory and 60 days of receivables. The SIDBI Credit Guarantee Fund Trust for Micro and Small Enterprises (CGTMSE) is applicable if the project is structured as an MSME entity under the Udyam Registration portal, enabling collateral-free coverage up to ₹500 crore for term loans. NABARD's Rural Infrastructure Development Fund (RIDF) offers refinancing for projects in rural clusters, while the Ministry of MSME's Prime Minister's Employment Generation Programme (PMEGP) provides a 15 to 35 percent subsidy on project cost for new entrepreneurs in the sector. The Cement manufacturers can leverage the Production Linked Incentive (PLI) scheme for bulk and specialised materials where applicable to downstream construction inputs. Working capital cycle for cement averages 45 to 55 days, comprising 20 days of raw material inventory (limestone, gypsum, fly ash), 7 days of work-in-progress, and 18 days of finished goods inventory at despatch depots. Receivables management requires a 30-day credit policy against dealer network sales, with letter of credit arrangements for institutional sales to government projects under PMAY-U. Interest Coverage Ratio benchmarks at 1.8 to 2.2x for the first three years of operations, strengthening to 3.5x by year five as capacity utilisation reaches 85 percent.

CapEx allocation (indicative)

Project CapEx ranges ₹198.0 crore - ₹2868 crore. Typical split for a viable, bank-ready configuration:

Plant & machinery: 45% (approx. ₹689.9 cr of ₹1,533 cr CapEx) 45% Building & civil: 22% (approx. ₹337.3 cr of ₹1,533 cr CapEx) 22% Utilities & power: 12% (approx. ₹184 cr of ₹1,533 cr CapEx) 12% Working capital: 14% (approx. ₹214.6 cr of ₹1,533 cr CapEx) 14% Contingency & misc: 7% (approx. ₹107.3 cr of ₹1,533 cr CapEx) AVERAGE ₹1,533 cr CapEx Plant & machinery 45% · ~₹689.9 cr Building & civil 22% · ~₹337.3 cr Utilities & power 12% · ~₹184 cr Working capital 14% · ~₹214.6 cr Contingency & misc 7% · ~₹107.3 cr Low ₹198 cr High ₹2,868 cr

Split is a typical mid-cap manufacturing configuration. Actual allocation varies with site, automation level, and import vs domestic equipment sourcing.

Cumulative cash position

Cumulative free cash from ₹1,533 cr CapEx, indicative breakeven by Year 4-5 at conservative utilisation assumptions.

0 ₹919.8 cr ₹-2146.2 cr Year 1: negative ₹-1992.9 cr cumulative (this year cash flow ₹-459.9 cr) Year 1 Year 2: negative ₹-1379.7 cr cumulative (this year cash flow +₹153.3 cr) Year 2 Year 3: negative ₹-843.15 cr cumulative (this year cash flow +₹536.6 cr) Year 3 Year 4: negative ₹-153.3 cr cumulative (this year cash flow +₹689.9 cr) Year 4 Year 5: positive +₹613.2 cr cumulative (this year cash flow +₹766.5 cr) Year 5

Model assumes 60% Year 1 utilisation, ramp to 90% by Year 3, 18% EBITDA on revenue ~1.6x CapEx at maturity. Engagement scope refines these to your specific configuration.

Risks and mitigation for this project

The three principal risks for a medium-scale cement project are commodity price volatility, demand cyclicality, and regulatory tightening on carbon emissions. Limestone cost represents 35 to 40 percent of variable production cost, and royalty rates are subject to state government revision cycles; in Rajasthan, limestone royalty has increased from ₹45 to ₹65 per tonne over the past four years. The cement demand cycle is correlated with monsoonal conditions and government spending timelines, with Q3 typically seeing a 15 to 20 percent dip in volumes due to construction sector slowdown.

A sensitivity analysis on the base case assumes 5 percent volume shortfall in Year 2, extending payback from 4.2 to 5.8 years. The third risk is the Carbon Credit market evolution and potential introduction of Emissions Trading Scheme (ETS) for the cement sector by 2026, which could impose an additional ₹120 to ₹180 per tonne of clinker cost for plants without carbon capture capability. Mitigation structures include fixed-price limestone supply agreements with captive mining operators extending 7 to 10 years, dealer network pre-payment schemes for retail customers, and technology selection favouring lower clinker-to-cement ratio grinding circuits to reduce carbon footprint intensity.

The DPR incorporates a downside scenario where EBITDA margin compresses by 200 basis points, which maintains DSCR above 1.25x throughout the loan tenure.

Risk matrix

Category-typical risks plotted by impact and probability. Hover a numbered dot to see the risk.

Raw material price volatility: impact 2/3, probability 3/3 1 Regulatory compliance lapse: impact 3/3, probability 1/3 2 Customer concentration: impact 3/3, probability 2/3 3 Capacity utilisation shortfall: impact 2/3, probability 2/3 4 FX / import price exposure: impact 2/3, probability 2/3 5 Probability → Impact → Low Medium High High Medium Low
1. Raw material price volatility
2. Regulatory compliance lapse
3. Customer concentration
4. Capacity utilisation shortfall
5. FX / import price exposure

How to engage with KAMRIT on this report

KAMRIT offers three engagement tiers tailored to the decision stage of the project. Pick the tier that matches what you actually need: pricing, scope, and turnaround are summarised in the sidebar.

Key market drivers

  • Housing for All scheme momentum
  • PMAY-U funding
  • PM Gati Shakti infrastructure pipeline
  • Real estate residential demand recovery

Competitive landscape

The Indian cement manufacturing (medium scale) market is sized at ₹26,562 crore in 2026 and is on a 8.3% trajectory to ₹46,499 crore by 2033. UltraTech Cement, ACC Limited and Ambuja Cements hold the leading positions , with Shree Cement, Dalmia Cement, JK Cement, Birla Corporation also profiled in this DPR. The full report benchmarks the new entrant's CapEx (₹198.0 crore - ₹2868 crore) and unit economics against the listed-peer cost structure, identifies the specific competitive gap a 3.0 - 5.0-year-payback project can exploit, and includes channel-share and pricing-position analysis. Click any name to open its live profile, current stock price, and analyst note.

UltraTech Cement ACC Limited Ambuja Cements Shree Cement Dalmia Cement JK Cement Birla Corporation

What's inside the Cement Manufacturing (Medium Scale) DPR

The Cement Manufacturing (Medium Scale) DPR is a 189-page PDF (Tier 2 also ships an Excel financial model) built around a mega-project entrant assumption. It covers land assembly and approvals, FSI calculation, structural-cost benchmarking, contractor selection, RERA-aligned escrow design, and unit-economics by phase. The financial side runs the full project economics for ₹198.0 crore - ₹2868 crore CapEx: line-itemised CapEx with vendor quotes, OpEx build-up by cost head, 5-year revenue projection by SKU and channel, P&L / balance sheet / cash flow, ROI, NPV, IRR, working-capital cycle, break-even, three-scenario sensitivity, and the Means of Finance recommendation. Payback of 3.0 - 5.0 years is back-tested against the listed-peer cost structure of UltraTech Cement and ACC Limited.

Numbers for this Cement Manufacturing (Medium Scale) project

Market, operating, and project economics at a glance

A focused view of the numbers that decide this mega-project project. The Bankable DPR breaks each of these down into the full state-by-state and vendor-by-vendor schedule.

India Cement Market Size (FY2026)

₹26,562 crore

Valuation at producer level across all cement grades; organised sector represents 78 percent of capacity.

Market Forecast (FY2033)

₹46,499 crore

Projected at 8.3 percent CAGR, driven by infrastructure pipeline and residential demand recovery under PMAY-U.

Project CapEx Band

₹198 crore - ₹2,868 crore

Wide range reflects grinding-only (₹198 crore for 1.2 MTPA) versus fully integrated 10,000 TPD kiln line.

Target Payback Period

3.0 - 5.0 years

Achievable at 75 to 80 percent capacity utilisation from Year 3; sensitivity extends to 5.8 years in downside demand scenario.

Thermal Energy Consumption (Modern Kiln)

750 - 780 kcal/kg clinker

Preheater-precalciner technology versus 1,100 kcal/kg for wet process; target aligned with PAT scheme under Energy Conservation Act.

Cement Grinding Power Consumption

32 - 36 kWh/tonne

Roller press-ball mill circuit for OPC 53-grade; compares to 38-42 kWh for ball mill only configuration.

Clinker-to-Cement Ratio (Industry Average)

0.75

BEE mandate targets 0.70 by 2030; advanced plants achieving 0.65 through fly ash and slag blending reduce limestone input per tonne.

WHRB Power Recovery

8 - 10 kWh/tonne clinker

Waste Heat Recovery Boiler recovers heat from kiln exhaust and cooler flue gases, displacing 30 to 35 percent of grid power requirement.

Per-Tonne Logistics Cost (150 km radius)

₹650 - ₹900/tonne

Cement is a high mass-to-value commodity; rail dispatch reduces per-km cost by 40 percent versus road transport for distances above 200 km.

Working Capital Cycle

45 - 55 days

Comprising 20-day raw material inventory, 7-day WIP, 18-day finished goods at depots, and 10-day dealer credit.

City-specific versions of this report

Setting up in your city? 20 location-specific overlays included.

Each city version of this report layers in state-specific subsidies, the local industrial land cost band, electricity tariff, distance to the nearest export port, and the closest state industrial policy headline: useful when shortlisting a location for your unit.

Table of Contents

20 chapters, 189 pages. Excel financial model included with Tier 2 and Tier 3.

Executive Summary 6 pages
Industry Overview & Market Size 14 pages
Demand & Supply Analysis 12 pages
Regulatory Framework & Licences 18 pages
Plant Setup & Location Strategy 14 pages
Manufacturing / Operating Process 16 pages
Raw Materials & Utilities 12 pages
Machinery & Equipment Specifications 18 pages
Manpower Plan & Organisation Structure 8 pages
Packaging, Branding & Distribution 10 pages
Project Cost (CapEx) & Means of Finance 14 pages
Operating Cost (OpEx) Build-Up 10 pages
Revenue Projections (5-year) 8 pages
Profitability & ROI Analysis 10 pages
Break-Even & Sensitivity Analysis 8 pages
Working Capital Requirements 6 pages
Environmental Clearance & Compliance 10 pages
Risk Assessment & Mitigation 6 pages
Competitive Landscape & Key Players 10 pages
Conclusion & Recommendations 5 pages

FAQs about this Cement Manufacturing (Medium Scale) project

What is the typical gestation period for a medium-scale integrated cement plant in India?

A 4,000 TPD integrated cement plant requires 24 to 30 months from environmental clearance to commercial production commencement, with the critical path typically running through limestone mining lease acquisition (6 to 12 months) and equipment supply and erection (14 to 16 months). Projects located in established industrial clusters such as Pithampur (Madhya Pradesh) or MIHAN (Nagpur) benefit from pre-built infrastructure and reduce gestation by 3 to 4 months.

What is the energy cost as a percentage of total production cost in modern cement plants?

Thermal energy constitutes 28 to 32 percent of total production cost in a modern preheater-precalciner kiln, while electrical energy accounts for 18 to 22 percent, bringing combined energy cost to 46 to 54 percent of total cost. The WHRB system recovers 8 to 10 kWh per tonne of clinker, reducing net grid power purchase by 30 to 35 percent and translating to annual savings of ₹18 to ₹22 crore for a 4,000 TPD plant.

How does the current GST rate on cement affect project economics?

Cement attracts GST at 28 percent, among the highest slabs, with input tax credit available on raw materials, packaging, and capital goods. The integrated structure of an Indian cement plant allows seamless credit flow between the clinker and grinding stages, unlike standalone grinding units which face credit inversion. This structural advantage improves the effective margin by 80 to 120 basis points for integrated players versus purchased-clinker grinding units.

What are the key factors driving clinker factor reduction in Indian cement manufacturing?

The Bureau of Energy Efficiency (BEE) and CPCB have mandated a clinker-to-cement ratio target of 0.70 by 2030, down from the current average of 0.75. Plants investing in vertical roller mills for slag and fly ash grinding can achieve ratios of 0.65 to 0.68, reducing limestone consumption per tonne of cement and directly lowering the variable cost per tonne by ₹180 to ₹220. This also reduces carbon tax exposure under future ETS scenarios.

What working capital intensity is typical for cement distribution operations?

Cement distribution requires a dealer network cash cycle of 25 to 30 days, with primary despatch to depots (10 days), secondary transit to retail yards (8 days), and credit to end customers (12 to 15 days). For a ₹650 crore plant generating annual revenue of ₹780 crore, the gross working capital requirement is approximately ₹95 crore, of which ₹30 crore is financed through distributor pre-payments and ₹65 crore through bank working capital limits.

Which Indian states offer the most conducive policy environment for new cement capacity?

Rajasthan, Chhattisgarh, and Madhya Pradesh provide the strongest policy frameworks for cement investment, with single-window clearance portals reducing establishment approvals to under 90 days for greenfield projects. Rajasthan offers a 5 percent capital subsidy on plant and machinery for investments above ₹200 crore, while Chhattisgarh provides a 4 percent interest subsidy on term loans for projects in identified backward districts. The limestone reserve quality in the Jaisalmer basin (Rajasthan) and Bilaspur region (Chhattisgarh) supports high-grade limestone availability at 44 to 46 percent CaO content.

Not sure which tier you need?

Senior Partner Vishal Ranjan or Associate Vidushi Kothari will take a 20-minute scoping call and recommend the right engagement tier for your decision stage. Response within one business day.

Regulatory references and primary sources

Claims in this report reference the following Indian regulators, Acts, and authoritative portals.

  1. Ministry of Corporate Affairs (MCA), Government of India
  2. Companies Act 2013
  3. Income-tax Act 1961
  4. Central Goods and Services Tax (CGST) Act 2017
  5. Micro, Small and Medium Enterprises Development Act 2006
  6. Udyam Registration Portal (Ministry of MSME)
  7. Real Estate (Regulation and Development) Act 2016 (RERA)
  8. Ministry of Housing and Urban Affairs
  9. National Building Code of India (NBCC) 2016
  10. Bureau of Indian Standards (BIS)
  11. Factories Act 1948

References open in a new tab. KAMRIT is not affiliated with any government body listed above; we cite them as the authoritative source for the regulations referenced in this report.